Skip to main content

RSM Home and Developers

NESPAK Housing Society · Lahore

Construction Company in NESPAK Housing Society, Lahore

NESPAK is a society planned for engineers, and the homes here are judged by engineers. RSM Home & Developers designs and builds houses across Phase 1, Phase 2 and Phase 3 with the drawings, steel schedules and on-site supervision to back every decision, from the first soil check to the day we hand you the keys.

Building in Lahore since 2008 · 1,000+ clients · Itemised quotes, no hidden costs

Contact FORM

Prefer to talk? Call 0322 7391447

Know your phase

One Society, Three Very Different Building Sites

NESPAK Housing Society was developed in phases, years apart, on different ground. Before we quote, we look at which phase your plot is in, because that decides how we design the foundation, set the plinth level and protect the house from damp.

Double-storey house under construction with brick walls and scaffolding

Off College Road · near Township

Phase 1: Rebuilds on Wide Kanal Plots

The oldest and most settled part of the society, with generous 1 and 2 kanal plots. Many houses here are 25 to 35 years old, and families now want to rebuild, add a floor for the next generation or bring an ageing home up to modern standards.

What we watch for: old shallow foundations, roads that are now higher than the plot, and working safely between occupied homes.

Basement excavation with rebar mesh ready for concrete pour

Canal Bank Road

Phase 2: Settled Homes Near the Canal

A green, well-established phase along the canal, loved for its quick access across Lahore. Plots closer to the canal can sit on wetter ground, which shows up years later as damp walls and salt marks if it is ignored at the foundation stage.

What we watch for: rising damp, basement seepage, and proper foundation and plinth waterproofing.

Groundbreaking ceremony setup with RSM Developers banners on a residential plot

Defence Road · near Valencia & WAPDA Town

Phase 3: First Homes on New Plots

The newest phase, where many plots are being built on for the first time. Some were filled and levelled during development, so the ground has never carried a house before and needs to be checked, not assumed.

What we watch for: filled soil, layer-by-layer compaction, and a plinth height that allows for future road levels.

Steel reinforcement laid for the foundation of a new house
SITE LOG · STEEL CHECKED AGAINST DRAWINGS BEFORE THE POUR

Our technical promise

Built to a Standard an Engineer Would Sign Off

Many NESPAK homeowners have spent their careers on roads, dams and buildings. They can read a drawing and spot a shortcut. We welcome that. This is what you get on every RSM project, in writing.

01Structural drawingsFoundation, column, beam and slab drawings prepared by a qualified structural engineer and shared with you before work starts.
02ConcreteA specified mix for every element, slump checks on site, and cube samples whenever you ask for them.
03SteelDeformed bars from named mills, with the brand written in your quotation, checked against the bar schedule before every pour.
04CuringSlabs ponded and walls kept wet for the full curing period, never cut short to save a few days.
05Damp and termitesA damp-proof course at plinth level and anti-termite treatment of the ground before backfilling.
06Site recordsA photo and video log of every stage, so nothing is hidden behind plaster and you can check the work from anywhere.
Front view of a double-storey house in grey structure stage
TV lounge interior with curved false ceiling and lounge chairs

Local problems, real solutions

What NESPAK Homeowners Tell Us, and How We Fix It

These are the things families across NESPAK say on our first site visit, in their own words, and what we do about each one.

My walls have white salt marks and the paint peels every year.

Our fix: This is rising damp (shor), common in older Phase 1 homes and on wetter ground near the canal. We lay a proper damp-proof course at plinth level, add waterproofing admixture to foundation and plinth concrete, and coat below-ground walls with bitumen where the water table is high. In renovations we cut out the salt-damaged plaster and re-plaster with a salt-resistant treatment instead of painting over it.

Rainwater from the road runs into my porch every monsoon.

Our fix: Years of road resurfacing have left many older houses below street level. We survey the levels of the road, your plot and the neighbours, set the new finished floor level safely above the road, slope the driveway and lawn away from the house and plan storm-water drains so rain leaves the plot.

Our top floor is unbearable in June, even with two ACs running.

Our fix: Large roofs on kanal houses soak up heat all day. We insulate the roof with EPS (thermopore) or foam concrete, finish it with tiles and a heat-reflective coat, use thicker or cavity walls on the west side and shade windows with chhajjas, so the upper floor stays cooler and your bills come down.

My old house has cracks. Can I just add another floor on top?

Our fix: Not without checking first. Our structural engineer inspects the existing foundation, columns and slabs and tells you honestly whether the house can take another floor, needs strengthening first, or will cost less to rebuild.

I work abroad and can’t be on site to check the work.

Our fix: Many NESPAK plot owners are engineers working in the Gulf, the UK or Canada. You get weekly photo and video updates, stage-wise payments tied to completed work, and live video walk-throughs whenever you want one.

Our last contractor couldn’t answer a single technical question.

Our fix: Our engineers run the site, not a labour contractor. You get the drawings and the steel schedule, and you can talk through any decision with the engineer responsible for it.

Weatherproof design

A Home Planned for Every Lahore Season

Lahore swings from summers above 45°C to monsoon downpours, then foggy, smoggy winters and spring dust storms. In NESPAK, where many families live in large multi-generation homes, comfort in every season matters. These are the details we build into the structure, not add on later.

Swipe to see more →

3D render of a luxury house front elevation with lit columns at night

May – July

Summer Heat

  • Insulated roof with a heat-reflective top coat
  • 9-inch or cavity walls on west and south sides
  • Chhajjas and deep window shades
  • Cross-ventilation and a vented stair tower
3D render of a modern corner house with dark cladding and decorative screen

July – September

Monsoon Rain

  • Roof slopes to outlets so water never ponds
  • Waterproofed roofs, washrooms and tanks
  • Raised plinth and proper site drainage
  • Drip edges and sealed window frames
3D render of a beige modern house with large glass windows

December – February

Winter, Fog & Smog

  • Sealed aluminium or uPVC windows
  • Double glazing on request
  • Living rooms placed to catch winter sun
  • Gas and heating points in every room
3D render of a modern double-storey house front with landscaping

March – June

Dust Storms & Wind

  • Anchored parapets, tanks and solar frames
  • Gasketed doors and windows
  • Covered or recessed main entrance
  • Boundary walls designed for wind load
3D render of a modern house front elevation with vertical glass facade

Thoughtful design

Before We Draw a Single Line

A NESPAK home has to suit your family today and in twenty years. These are the questions we work through with you before the drawings are final.

  1. Sun path and plot facingRooms and windows placed to keep summer sun out and let winter sun in.
  2. Joint family livingSeparate portions, a ground-floor bedroom for elders and separate meters if needed.
  3. Parking for two or three carsPorch, gate width and turning space planned for every vehicle.
  4. A future floorFoundation, columns and stairs designed now for the floor you may add later.
  5. Society by-lawsSetbacks, covered area and height designed to current NESPAK and LDA rules.
  6. Water storage and pressureTanks, pumps and pipe sizes for steady pressure on every floor.
  7. Solar-ready roofSpace, conduits and wiring ready for panels from day one.
  8. An elevation that fitsA modern front that respects the scale of the street.

What we build

Construction Services in NESPAK Housing Society

Choose structure only, or a complete home handed over with the keys. Every service comes with the same engineers, supervision and itemised pricing.

Swipe to see more →

Grey structure of a contemporary house with a brown main gate

Grey Structure

Excavation, foundation, RCC frame, slabs, brickwork and plaster, built strictly to your approved structural drawings.

3D render of a contemporary two-storey house with wood and stone facade

Turnkey Construction

Structure, plumbing, electrical, flooring, woodwork, paint and fixtures delivered as one package, ready to move in.

3D render of a classical-style house elevation with grand entrance

Architecture and 3D

Floor plans, 3D elevations and structural, electrical and plumbing drawings prepared for NESPAK approval.

Luxury drawing room interior with chandelier and round sofa set

Interiors and Finishing

Kitchens, wardrobes, false ceilings and lighting chosen to suit your design, lifestyle and budget.

Client reviews

What Our Clients Say

How it works

Your NESPAK Project, Step by Step

Clear stages, clear payments and no surprises.

STEP 01

Site Visit

We visit your plot or house, take levels and check the ground, free of charge.

STEP 02

Design and Approval

Floor plans, 3D elevation and drawings prepared for NESPAK society approval.

STEP 03

Itemised Quote

Materials, brands, timeline and stage-wise payments, written into the agreement.

STEP 04

Supervised Build

Engineers on site at every stage, with photo and video updates for you.

STEP 05

Handover

A snag-list walk-through, every fix completed, then the keys and your drawings.

FAQs

Questions NESPAK Homeowners Ask Us

Still have a question? Talk to our team directly.

Clients and team at the foundation trench during groundbreaking

Yes. We work in Phase 1 off College Road, Phase 2 on Canal Bank Road and Phase 3 on Defence Road, on new plots as well as older houses that need renovation, an extra floor or a complete rebuild.

Yes. Your building plan must be approved by the society before work begins. We prepare the architectural and structural drawings to the current NESPAK and LDA requirements and help you through the submission.

Often, yes, but only after our structural engineer has checked the existing foundation, columns and slabs. If the structure cannot safely take the extra load, we will tell you and explain the options, including strengthening or rebuilding.

We use a proper damp-proof course, waterproofing admixture in foundation and plinth concrete, a bitumen coat on below-ground walls and a raised plinth with good drainage, so moisture is stopped at the base instead of being painted over.

Absolutely. You receive the structural drawings, and before every pour we check the steel against the bar schedule. You are welcome to inspect it on site or over a live video call.

Yes. Many of our clients are overseas. We share weekly photo and video updates, link payments to completed stages and arrange live video walk-throughs whenever you need them.

Build or rebuild in NESPAK

Planning a New Home in NESPAK Housing Society?

Tell us your phase, block and plot size. Our engineer will visit, take levels, check the ground and give you honest advice and an itemised estimate, free of charge.

Plot #6, opposite Expo Center Road, Lahore · Mon–Sat, 9 am – 9 pm